This is the opening that needed to be filled
I came up whit this pattern and Had it water-jet from a sheet of 5051 1/8" aluminum
I welded up three steel frames to hold the three aluminum panels.
Final install was about 20 feet up and located in the main entrance lobby of the Walkway condos in uptown minneapolis.
No comments:
Post a Comment
Leave me a comment, I appreciate your input!